Tuesday 12 March 2013

Bathroom Makeover

After 4 weeks of not having a bathroom and using friends showers and our second loo we finally have our bathroom makeover completed.

This was not just a case of new bath and loo but a complete replacement of the floor, re-plaster and tile, no small task and one expertly done by our fitters.


The original bath, note the window and shower curtain, good job we had
frosted glass else people would have had a fright sight.
The old boiler now relocated in the loft.
The floor was rotten through and had to be replaced


As bad as it looks Yuck!
Neil, our fitter, pulled the stops out and has given us a bathroom worthy of Cheshire life magazine review


The smaller window makes more room for the shower

Heated towel radiator

Proper shower screen and water spout, no taps.
Shower has main head and smaller hand shower head.

The new floor enabled us to lay new Carndene flooring

Bath taps located in the wall so easier to clean.

Needless to say Chris is chuffed to bits with it, as am I.

1 comment:

Lisa said...

Looks fantastic,
Lisa